SpaceX Starship page

FAQ

  1. When next launch? (Flight 16) NET Q4 2026.
  2. When previous launch? (Flight 15) Starship Flight 15 (Starlink Group 31-2) launched on 2026-11-13.
  3. What was the result? B22 aborts catch attempt but splashes down just offshore. S42 deploys 26 Starlink satellites. S42 spends 22 hours in orbit, returns to the launch site, and is caught by the chopsticks.

Previous Flights

Click to expand
  • Flight 1: S24 and B7. First full stack launch, RUD before stage separation.
  • Flight 2: S25 and B9. Successful stage separation, booster RUD during boostback burn, ship RUD shortly prior to scheduled SECO.
  • Flight 3: S28 and B10. Booster performs a successful boostback burn, but experiences RUD during landing burn. Ship makes it past SECO, but loses attitude control and is destroyed on reentry.
  • Flight 4: S29 and B11. First successful booster water landing. Ship survives reentry despite burn-through on forward flap, and performs a successful water landing.
  • Flight 5: S30 and B12. First booster catch with chopsticks. Ship performs successful water landing.
  • Flight 6: S31 and B13. Booster offshore divert due to damage to catch tower during launch. Ship performs successful water landing.
  • Flight 7: S33 and B14-1. First V2 Ship launch. Harmonic oscillation on ship causes RUD before SECO. Booster is caught by chopsticks.
  • Flight 8: S34 and B15-1. Engine failure on ship causes RUD before SECO. Booster is caught by chopsticks.
  • Flight 9: S35 and B14-2. First booster reflight. Ship makes it past SECO, but loses attitude control and is destroyed on reentry. Booster RUD upon landing burn startup prior to planned splashdown.
  • Flight 10: S37 and B16. All mission objectives fulfilled. First V2 ship to make it through reentry to landing burn and splashdown. First successful deployment of Starlink simulators. Booster successfully tested landing without one centre engine, using an engine on the middle ring to compensate.
  • Flight 11: S38 and B15-2. All mission objectives fulfilled. Ship performs successful landing burn and splashdown, despite intentional missing tiles on heatshield. Second successful deployment of Starlink simulators. Booster successfully tested a 13-5-3 engine landing profile.
  • Flight 12: First V3 launch. Successful liftoff. Booster boostback burn is incomplete, and landing burn fails. Ship experiences an R-vac out shortly after stage separation, but limps to orbit on 5/6 engines. In-space raptor relight is cancelled, but payload deployment is nominal. Ship reentry, landing burn, and splashdown are nominal.
  • Fight 13: Successful liftoff and staging. B20 had a good boostback burn, but landing burn had insufficient engines. S40 performs perfectly, with nominal payload deploy and in-space raptor relight. Ship reentry, landing burn, are nominal, and S40 remains intact after splashdown.
  • Flight 14: B21 soft splashdown on target. S41 becomes the first ship to perform an orbital insertion burn. 26 Starlink v3 satellites are deployed. S41 performs a deorbit burn, followed by nominal ship reentry, landing burn, and splashdown.
  • Flight 15: B22 aborts catch attempt but splashes down just offshore. S42 deploys 26 Starlink satellites. S42 becomes the first orbital Starship be caught by the chopsticks.

Quick Links

Nerdle Cam | Lab Cam | Sapphire Cam | Sentinel Cam | Rover Cam | Rover 2.0 Cam | Rocket Ranch Cam | Plex Cam | NSF Starbase Live | afarTV Florida Gigabay Live | RGV Aerial Starbase Live

Starship Dev October | Starlink 31-1 (flight 14) | Starship Dev September | Starship Dev August | Flight 13 | Starship Dev July | Starship Dev June

2026-04-27 SpaceX Starship Update Video


Road closures, road delays, and beach closures

Vehicle Status

*As of 2026-11-24

Ship Location Status Comments
S39.1 (test tank) Massey’s Scrapping Returns from Massey’s Jul 26th. (NSF, ViX, TrackingTheSB) Rolls back out to Massey’s Oct 5th. Scrapping begins Nov 13th.
S40 Gigabay Post-flight inspections Stacking took place from Nov 12th through March 2nd. Cryo testing from May 3rd through May 6th. Engine testing Jun 24th through 26th. Launched Jul 24th. Returns to Megabay 2 Oct 12th. Moves to Gigabay Nov 7th.
S42 Megabay 2 Post-flight inspections Stacking began Jul 11th. Cryo tested Sep 3rd and 4th. Chopsticks testing Sep 11th and 12th. Static fired Oct 26th and Oct 27th. Launched Nov 13th, caught Nov 14th.
S43 Megabay 2 Pending engine install Stacking began around Aug 19th. Cryo testing Oct 23rd through 25th.
S43.1 (test tank) Massey’s Testing
S44 Massey’s Cryo testing Stacking began Oct 2. Assembly completed around Oct 22nd. Cryo tested Nov 20th through 23rd.
S45 Megabay 2 Stacking Stacking began Oct 22nd.
S46 Starfactory
Booster Location Status Comment
B18.1 Massey’s Testing
B18.3 Massey’s Testing
B22 Gulf of Mexico Destroyed Stacking started Jun 29th. Cryo tested Sep 9th. Static fired Oct 25th. Launched Nov 13th, destroyed by FTS upon splashdown.
B23 Megabay 1 Pending engine install or transport to Florida Stacking started around Aug 14th. Cryo testing Oct 13th through Oct 18th.
B24 Massey’s Cryo testing Stacking began around Sep 30th. Stacking completed by Oct 31st. Cryo tested Nov 22nd through 23rd.
B25 Megabay 1 Stacking Stacking began around Nov 2nd.

Resources

  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    1
    ·
    3 hours ago

    2026-11-23:

    • Massey’s: Overnight, B24 completes its first cryo test. (NSF, ViX, RGV Aerial, Blobifie)
    • Road delay for “Masseys to Production” is posted for Nov 23rd 23:59 to Nov 24th 04:00. (starbase.texas.gov, archive, ViX)
    • S44 performs its 3rd cryo test. (ViX, Blobifie)
    • B24 moves from the cryo station to the Massey’s exit. (RGV Aerial)
    • Production site: B25’s A2:4 section moves from Starfactory to Megabay 1. (ViX)
    • The Gigabay (TX) right door is closed for the first time. (wvmattz, RGV Aerial, RoughRidersShow, Anderson)
    • The LOX landing tank installation jig is sighted outside Starfactory. (ViX)
    • Upcoming launches: An FCC filing for Starlink Group 31-4 out of Starbase is posted, NET Dec 10th. (apps.fcc.gov)
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 day ago

    2026-11-22:

  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    1
    ·
    2 days ago

    2026-11-21:

    • Nov 20th addenda: The rented LR11000 crane lifted another of the angled wall sections into the Pad 1 flame trench. (ViX)
    • B25’s LOX landing tank was moved from Starfactory to Megabay 1. (ViX, RGV Aerial)
    • Massey’s: Overnight, S44 performs its second cryo test. (NSF, ViX, StarshipGazer, Blobifie)
    • Florida: A ship transport stand and some other stands are loaded onto You’ll Thank Me Later at the KSC turn basin. (NSF)
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    2
    ·
    3 days ago

    2026-11-20:

    • Massey’s: B24 rolls out to Massey’s. (ViX 1, )
    • S44 performs what appears to be an ambient-temperature pressure test. (ViX)
    • S44 performs its first cryo test. (NSF, TrackingTheSB)
    • Production site: S46’s nosecone is mated with the common dome section. (ViX)
    • A ship nosecone, likely S47 is observed in Starfactory. Forward flaps are already installed. (TrackingTheSB)
    • Construction of the connection between the Gigabay (TX) and Starfactory continues. (Anderson / Gisler)
    • Pad 2: The right chopstick stabiliser strut is removed. (ViX)
    • A braided hose is removed from the ship quick disconnect. (ViX)
    • McGregor: R3.301 (new highest) leaves the testing area. (ringwatchers 1, ringwatchers 2)
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    2
    ·
    4 days ago

    2026-11-19:

    • Nov 18th McGregor addendum: R3.106 heads for another round of testing. R3.134, and R3.278 leave testing area. (ringwatchers 1, ringwatchers 2)
    • Flight 15: Contrary to SpaceX’s claims, at least one piece of B22 has washed ashore in Mexico. (mcrs987, ezbaze_ 1, ezbaze_ 2)
    • Production site: The overnight road delay went unused. (ViX)
    • S46’s nosecone moves from Starfactory to Megabay 2. (ViX)
    • Ship thrust simulator stand arrives at Megabay 2. (ViX)
    • S44 is transferred to the thrust simulator stand. (ViX)
    • In the afternoon, S44 moves from Megabay 2 to Massey’s. (NSF, Avid Space 1, Avid Space 2, ViX, cnunez 1, cnunez 2, Blobifie)
    • Road delay for “Production to Masseys” is listed for Nov 19th 23:59 to Nov 20th 04:00. (starbase.texas.gov, archive)
    • The final boom of the last remaining tower crane is lowered to the ground. (NSF)
    • The Gigabay (TX) front right door is positioned for installation. In Megabay 2, the two raceways for S45 are positioned on the rear of the ship work stand. (ViX)
    • Booster thrust simulator stand enters Megabay 1. (ViX)
    • S45 is transferred to the centre work stand. (ViX)
    • S46’s payload section enters Megabay 2. (ViX)
    • B24 is staged for rollout to Massey’s. (NSF, ViX)
    • Massey’s: The LOX landing tank test article is removed from the test cage. The tank performed at least 18 rounds of testing. (ViX)
    • Pad 2: The stabiliser arm beneath the left chopstick is partly dismantled, and one of the struts is lowered to the ground. (ViX)
    • Florida: First Starship flight from LC-39A is likely NET Jan 8th. (SpaceNotices, compass.atfm.aero (pptx warning))
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    3
    ·
    5 days ago

    2026-11-18:

    • Massey’s: Overnight, the booster and ship thrust simulator stands move from Massey’s to Sanchez. (ViX)
    • Road delay for “Production to Masseys” was posted for Nov 18th 23:59 to Nov 19th 04:00. (Avid Space, ViX)
    • Road delays for “Production to Masseys” are posted for Nov 19th 10:00 to 14:00 and Nov 19th 23:59 to Nov 20th 04:00. (starbase.texas.gov, archive)
    • Production site: An R-vac and a ship transport stand are delivered to Megabay 2. S42 is lifted on and off the transport stand a couple of times before being transferred to the left work stand. The ship transport stand then moves to Sanchez. (ViX, Blobifie)
    • Pad 2: The launch mount service structure lifted into the launch mount. (ViX)
    • The chopsticks descend to the base of the tower. (ViX)
    • Pad 1: Installation of additional boom sections on the SpaceX-owned LR11000 crane is underway, and the rented LR11000 crane is raised. (ViX)
    • Other: A possible test patch of the stainless steel wool which will replace the ablative heatshield material beneath the ship catch points is identified on one of S42’s aft flaps. (StarshipGazer, Killip)
    • S42 will not be reflown. (xdNiBoR / Elon)
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    3
    ·
    6 days ago

    2026-11-17:

    • Flight 15: Slow-motion videos of the ship catch are posted. (SpaceX)
    • Massey’s: Scrapping of the S39.1 test tank continues. (ViX, RGV Aerial)
    • Road delay for “Masseys to Production” is posted for Nov 17th 23:59 to Nov 18th 04:00, likely for transportation of ship stand to pick up S44 for cryo testing. (starbase.texas.gov, archive, RGV Aerial)
    • Pad 2: The chopsticks rise partway up the tower. (ViX)
    • McGregor: R3.2x0 returns from the testing area and and R3.278 heads towards the testing area. (ringwatchers 1, ringwatchers 2)
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    3
    ·
    15 days ago

    2026-11-08:

    • Massey’s: Overnight, cryo plumbing sections were reportedly moved from Sanchez to Massey’s. (RGV Aerial)
    • Production site: Overnight, the ship lifting jig, S45’s transfer tubes and installation jig, and a single Raptor engine enter Megabay 2. (ViX)
    • The booster lifting jig enters Megabay 1. (ViX)
    • Road delay for “Production to Pad” is posted for Nov 9th 10:00 to 14:00. (starbase.texas.gov, archive)
    • Pad 2: Chopsticks are raised, and launch and catch deluge tests are performed. (Avid Space, ViX, ViX, RGV Aerial)
    • The booster quick disconnects perform extension and retraction tests. (ViX)
    • The booster hold-down clamps are tested individually and simultaneously. (ViX)
    • Flight 15: NOTAMs for ship reentry and splashdown are posted for Chile. (notams.aim.faa.gov 1, notams.aim.faa.gov 2, LunarCitizens, aipchile.dgac.gob.cl, space-notices.com, SpaceNotices (X))
    • Other: mcrs987 deduces the superheavy internal grid fin support structure. (mcrs987)
  • Decronym@lemmy.decronym.xyzB
    link
    fedilink
    English
    arrow-up
    3
    ·
    edit-2
    3 hours ago

    Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I’ve seen in this thread:

    Fewer Letters More Letters
    301 Cr-Ni stainless steel (X10CrNi18-8): high tensile strength, good ductility
    FCC Federal Communications Commission
    ~ (Iron/steel) Face-Centered Cubic crystalline structure
    GNC Guidance/Navigation/Control
    KSC Kennedy Space Center, Florida
    LC-39A Launch Complex 39A, Kennedy (SpaceX F9/Heavy)
    LOX Liquid Oxygen
    NET No Earlier Than
    NOTAM Notice to Air Missions of flight hazards
    NSF NasaSpaceFlight forum
    ~ National Science Foundation
    Jargon Definition
    Raptor Methane-fueled rocket engine under development by SpaceX
    Starlink SpaceX’s world-wide satellite broadband constellation
    cryogenic Very low temperature fluid; materials that would be gaseous at room temperature/pressure
    ~ (In re: rocket fuel) Often synonymous with hydrolox
    hydrolox Portmanteau: liquid hydrogen fuel, liquid oxygen oxidizer
    iron waffle Compact “waffle-iron” aerodynamic control surface, acts as a wing without needing to be as large; also, “grid fin”
    regenerative A method for cooling a rocket engine, by passing the cryogenic fuel through channels in the bell or chamber wall

    [Thread #11 for this comm, first seen 11th Nov 2026, 07:55] [FAQ] [Full list] [Contact] [Source code]

  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    3
    ·
    18 days ago

    2026-11-02 addendum:

    • Photo of B25’s common dome before it entered Megabay 1. (RGV Aerial)

    2026-11-04 addenda:

    • Massey’s: The second reaction frame was removed from the nosecone crush structure at Massey’s. (ViX)
    • Launch site: Scaffolding was removed from the Pad 2 launch mount, and the booster quick disconnects performed extension and retraction tests. (ViX)
    • The Pad 2 deluge was tested twice, simulating launch and booster catch. (ViX, RGV Aerial)
    • Pad 2 chopsticks testing was also observed. (ViX, RGV Aerial)
    • A section of rebar at the cryo offload area was relocated by several humans. (ViX)
    • Production site: The tall LR13000 (1300?) crane was shortened. (ViX, cnunez)
    • B25’s A3:4 section was moved from Starfactory to Megabay 1. (ViX)

    2026-11-05:

    • Launch site: Some of the pipes for Pad 1 the deluge system are moved. (ViX)
    • A ramp section of the Pad 1 flame trench is lifted into position. (ViX)
    • The Pad 2 deluge system is tested once. (NSF, ViX)
    • Production site: Construction between the Gigabay (TX) and Starfactory continues. (ViX)
    • S45’s A3:4 section is moved from Starfactory to Megabay 2. (ViX)
    • McGregor: R3.2x9 leaves the testing area. (ringwatchers)
    • Florida: LC-39A deluge system is tested twice, simulating launch and booster catch. (NSF)
    • Upcoming flights: Flight 15 is now NET Nov 13th, and flight 16 is now NET Dec 10th. (Avid Space, compass.atfm.aero, archive, Dontchev via Berger)
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    3
    ·
    17 days ago

    2026-11-06:

    • Production site: S45 is stacked on its A3:4 section. (ViX)
    • Massey’s: S43.1 is still in the nosecone crush test structure. (RGV Aerial)
    • Road delays for “Production to Masseys” are posted for Nov 6th and Nov 7th, both from 23:59 to 04:00 the following day. (starbase.texas.gov, archive, Avid Space, ViX)
    • Pad 2: Booster hold-down clamps are tested. (ViX)
    • The launch mount service structure is moved away from the pad. (ViX)
    • The chopsticks are raised. (ViX, RGV Aerial)
    • Booster quick disconnects are extended, purged, and retracted. (ViX, RGV Aerial)
    • Launch and catch deluge tests are performed. (ViX)
    • Booster quick disconnects are extended, and the chopsticks are lowered. (ViX)
    • McGregor: An R-vac engine heads towards the testing area. (ringwatchers)
    • R3.144 returns from the testing area. (ringwatchers)
    • A map of all six Raptor test cells is posted. (mcrs987)
    • Starship documentary series Episode 4 “Go For Orbit” is posted. (SpaceX website with direct download, Twitter, YouTube (not yet, it seems))
    • Header propellant masses post-insertion burn are visible. (mcrs987)
    • Regen circuit on Raptor 3 is visible. (mcrs987)
    • More details on the R-vac shutdown. Helium and LOX leaking places they shouldn’t. (mcrs987)
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    3
    ·
    16 days ago

    2026-11-07:

    • Nov 6th addendum: “It is so tempting to make a 500 ton thrust Raptor 4 in place of the 250 ton Raptor 3 for the outer ring of the Starship booster” (Elon)
    • Production site: S40 moves from Megabay 2 to the Gigabay (TX). (NSF, Avid Space 1, Avid Space 2, ViX 1, ViX 2, JLP734, Liedtke 1, Liedtke 2, Anderson, Blobifie 1, Blobifie 2, Blobifie 3)
    • S40 is positioned in the front left workstation in the right half of the Gigabay (TX). (Anderson)
    • B24’s A4 section moves from Starfactory to Megabay 1. (ViX)
    • S45’s transfer tubes move from Starfactory to Megabay 2. (ViX)
    • Massey’s: Overnight, one of the large valve skids moves from Sanchez to Massey’s. (ViX)
    • Road delay for “Production to Masseys” is still listed for Nov 7th 23:59 PM to Nov 8th 04:00. (starbase.texas.gov, archive)
    • Flight 15: NOTAMs for ship reentry and splashdown are posted for Mauritius for Nov 13th through 19th. (NSF, Avid Space, interstellargw)
    • SpaceX post a ship catch render, and confirm NET 13th date. (SpaceX)
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    2
    ·
    7 days ago

    2026-11-16:

    • Flight 15: Explanation of booster offshore divert and green flame during landing burn. Slight underperformance of engines caused B22 to run low on fuel, causing a slightly early boostback burn shutdown. Low fuel also caused the engines to run oxygen-rich, which burned copper in the regenerative cooling circuit. “the solution is to improve engine performance and performance consistency (underway with Raptor V3.2), as well as adjust flight software to do MECO1 about one second earlier to ensure enough propellant for boostback and landing (tiny change)” (Dodd, Elon, Manley, Elon)
    • SpaceX post S42 catch video camera angles from drones, the ship itself, and the tower. (SpaceX 1, SpaceX 2, SpaceX 3)
    • Ablative material scraped off by the chopsticks during the catch will be replaced with stainless steel wool on future flights. (xdNiBoR, Elon)
    • Closeup photos of S42 during rollback. (StarshipGazer 1, StarshipGazer 2)
    • Long-term goals: “Propellant cost per flight will drop below $500k and payload will exceed 200 tons” (pronounced_kyle, Elon)
    • Pad 2: The booster quick disconnects are tested. (ViX)
    • Production site: The bridge crane block is lowered and raised again. New cable management cages are observed. (ViX)
    • In Megabay 1, B25’s transfer tube is raised for installation. (ViX, efraser77)
    • McGregor: R-vac R3.291 heads towards the testing area, and R-vac R3.1xx returns from the testing area. (ringwatchers 1, ringwatchers 2, ringwatchers 3)
  • threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    2
    ·
    21 days ago

    2026-11-02:

    • Production site: B25 common dome moves from Starfactory to Megabay 1. (ViX, ViX 2)
    • B25’s A2 section enters Megabay 1. (ViX)
    • Pad 1: After a brief stop at Sanchez, the dead-line spool for the drawworks is delivered to the launch site. (ViX 1, ViX 2)
    • Flame trench construction continues. (RGV Aerial)
    • Pad 2: Workers are observed at the booster quick disconnects. (efraser77)
    • The launch mount has been painted dark grey. (Blobifie)
    • Massey’s: LR11000 crane and crew lift activities are observed near the nosecone test structure. (ViX)