Can I put an additional load before switches on a dedicated circuit?

The example circuit goes from the service panel to a two-way (SPDT) switch at the house back door. From there the circuit goes to another two-way switch out in the garage. The circuit then powers the garage lights.

The goal is to add additional lights on this circuit near the service panel so that the same switches would also control the new lights.

How wrong would it be to add this new load between the service panel and the first two-way switch? This would save the (huge) effort to run wire from the garage back to the house.

  • Soolonkivi@lemm.ee
    link
    fedilink
    English
    arrow-up
    1
    ·
    3 months ago

    No, they wouldn’t burn out, the garage lights would only work when the light near the panel is lit and both lights would be dimmer if lit at the same time.